Tekplan Solutions Georgia provides temperature controls solutions, mechanical services, and full operations and maintenance services to commercial, industrial, and government customers.

Tekplan Affiliations

Tekplan Solutions Georgia offers Delta Controls.

Richards/Zeta Building Intelligence

 

 

Tekplan Solutions Georgia LLC Portfolio

Georgia Links:
Services |  Products |  Portfolio |  Contact Sales @ Tekplan Solutions Georgia |  Search
Delta Controls |


 

Within the past twelve years, employees of TEKPLAN SOLUTIONS GEORGIA, LLC have provided products and services for the projects listed on this page. Please contact us for additional information.

Atlanta College of Arts DDC Controls System Design and Installation - Honeywell LCBS
Atlanta Public Schools DDC Controls System Design, Installation, and Service
Bank of America Tower DDC Controls System Service and Additions
CNN Atlanta World Headquarters Web-enabled DDC Controls System Integration of Proprietary Systems to BACnet, Design, Installation, and Service
Fort McPherson

DDC Controls System Design and Installation - 7 Base Facilities

Olympic Stadium/Turner Field DDC Controls System Design, Installation, and Service
Riverside Village DDC Controls System Design, Installation, and Service 
Turner Production Studios Installation and service of Delta Controls BACnet products, which includes replacing the Network 8000 system or interfacing with it 
University of Georgia  Installation and service of Delta Controls BACnet products, which includes replacing the Network 8000 system or interfacing with it.  One of only three approved BACnet vendors for all new work.  
US Postal Facilities DDC Controls Design, Installation and Service, LON-based products

Project:  Atlanta College of Arts - New Dorms

Owner:  Atlanta College of Art

Scope:  Design and Install DDC controls for the boiler and central plant and 114 room sensors in the 6-story dorm using Honeywell LCBS.

↑ Top


Project:  Atlanta Public Schools (Install Network 8000 systems in nine schools)

Owner:  Atlanta Public Schools

Scope:  Provide follow-up service on nine existing public schools with Barber-Colman Network 8000.

Project Size:  Time & material service work being performed on an as-needed basis by Tekplan Solutions Georgia.

↑ Top


Project:  Bank of America Tower (Formerly NationsBank Tower)

Owner:  CSC Associates, L.P.Bank of America Tower

Managed by:  Cousins Properties Incorporated

Scope:  Service the controls in the 56-story Bank of America building on North Avenue and Peachtree Street. Building Automation installed is a Barber-Colman Network 8000 with Signal Graphical User Interface. There are over 3000 points on this project.

Service Scope:  To provide tenant lease construction modification and additions. To provide time & material on demand service to the facility personnel.

↑ Top


Project:  CNN Atlanta World HeadquartersCNN World Headquarters in Atlanta, GA

Owner:  Turner Properties

Scope:  Replace the DDC controls in the CNN Atlanta World Headquarters and the Omni Hotel over a five-year schedule with a Barber-Colman Network 8000 digital control system with Signal Graphical User Interface.

↑ Top


Project:  Olympic Stadium/Turner Field

Owner:  Turner Properties

Scope:  Install the building automation system in the original Olympic Stadium, then convert it during the Turner Field construction. BAS installed is a Barber-Colman Network 8000 with Signal Graphical User Interface.

↑ Top


Project:  Riverside Village

Owner:  Post Properties

Project Scope:  Provide and install a Barber-Colman Network 8000 BAS with Signal Graphical User Interface in the headquarters building of Post Properties.

↑ Top


Project:  Turner Production Studios

Owner:  Turner Entertainment

Scope:  Install a Barber-Colman Network 8000 with Signal Graphical User Interface in the new movie production studios of Turner Entertainment.

↑ Top


Project:  University of Georgia - Animal Science Building

Owner:  University of Georgia

Project Scope:  Install a BAS in this research laboratory with a Siebe Network 8000 System and Host Software compliant with the campus LAN. System included the installation of controls for 38 research labs. Some of these labs were BSL 2.0+ rated and certified.

↑ Top


Project:  University of Georgia - Poultry Diagnostic Research

Owner:  University of Georgia

Project Scope:  Install a BAS using the Barber-Colman Network 8000 System with Host Software interfacing with the campus LAN.

↑ Top


Project:  United States Post Office Facilities (32 completed to date)

Area Manager:  Grant Baker

Scope:  Provide follow-up service on the first 16 facilities that are out of warranty and warranty work on the present 16 facilities that are in warranty. Original scope included installation of Distech building automation with open LON based products to control facility time of usage for Group I & II.  Group III is pending approval for an additional 20 facilities in the north Georgia area.

↑ Top

Back to Top

    


Home | About Us | Services | Why Tekplan? | Solutions | Fort Myers, FL | Tampa, FL | Atlanta, GA | Houston, TX | Weslaco, TX | Contact Us
Tekplan Solutions, LLC • 7505 Kinnikinnick Drive • Roscoe • Illinois 61073 • USA •
Telephone (001) 815-985-4496 • Fax (001) 815-623-7271
© 2003-2005 Tekplan Solutions, LLC All rights reserved.

Website designed, written and maintained by Norstar Creations.