|
Atlanta College of Arts |
DDC Controls System Design and Installation -
Honeywell LCBS |
| Atlanta Public Schools |
DDC Controls System Design,
Installation, and Service |
| Bank of America Tower |
DDC Controls System Service
and Additions |
| CNN Atlanta World Headquarters |
Web-enabled DDC Controls System Integration of
Proprietary Systems to BACnet, Design, Installation, and Service |
| Fort McPherson |
|
DDC Controls System
Design and Installation - 7 Base Facilities |
|
| Olympic Stadium/Turner Field |
DDC Controls System Design, Installation, and
Service |
| Riverside Village |
DDC Controls System Design, Installation, and
Service |
| Turner Production Studios |
Installation and
service of Delta Controls BACnet products, which includes replacing the Network
8000 system or interfacing with it |
| University of Georgia |
Installation and service of Delta
Controls BACnet products, which includes replacing the Network 8000 system
or interfacing with it.
One of only
three approved BACnet vendors for all new work. |
| US Postal Facilities |
DDC Controls Design,
Installation and Service, LON-based products |
Project: Bank
of America Tower (Formerly NationsBank Tower)
Owner: CSC
Associates, L.P.
Managed by: Cousins
Properties Incorporated
Scope:
Service the controls in the 56-story Bank of America building on North Avenue
and Peachtree Street. Building Automation installed is a Barber-Colman Network 8000 with
Signal Graphical User Interface. There are over 3000 points on this
project.
Service Scope: To
provide tenant lease construction modification and additions. To provide time &
material on demand service to the facility personnel.
↑ Top